Pond Rehabilitation and upgrading work
4.866kms length of PVC pipe laying
Pond De-Silting,De-watering & Clearing Water
Multiple Trench Excavation ,UPVC pipe laying Projects
Construction of Reservoir (embankement fill)
1.45 kms length of PVC pipe laying & Red Ash placing
48000.00 Meter Cube embankment work(fill)